Sludge production – model calculations
Indicative estimate of excess sludge production based on biomass parameters and WWTP loading. Results are rough estimates — for design use detailed models or mass balances.
Common inputs for all calculations
1. Simple calculation using Yb, b and sludge age
Good for a quick estimate, mainly for systems with sludge age up to ~5 days.
Yobs
0.368
BOD₅ removed [t/yr]
1.84 t/yr
Biomass growth
0.68 t DS/yr
Inert contribution
0.29 t/yr
Sludge in effluent
0.01 t/yr
Total dry solids
0.96 t DS/yr
Wet sludge
4.78 t/yr
2. More detailed calculation for higher sludge ages
Uses an extended expression for the observed yield. Needs more parameters; wrong estimates may reduce accuracy compared to the simple approach.
Yobs
0.390
Biomass growth
0.72 t DS/yr
Inert contribution
0.29 t/yr
Sludge in effluent
0.01 t/yr
Total dry solids
1.00 t DS/yr
Wet sludge
4.98 t/yr
3. Chemical sludge from P-precipitation (very rough)
Rough estimate of sludge from ferric dosing. Assumes ferric phosphate and ferric hydroxide; other effects are neglected.
Fe dose [t/year]
1.13 t/yr
Chemical sludge
3.05 t DS/yr
Note: the calculation assumes formation of ferric phosphate and ferric hydroxide; other effects are neglected.
Note: all calculations are indicative and for checks or preliminary estimates only, not as the sole basis for design.